Method statement
Scope and site
[Add your information]
Resources and sequence
[Add your information]
Review and evidence
[Add your information]
Enter the job, sequence of work and the controls for each hazard, and this free method statement generator produces an editable method statement; you remain responsible for the content.
Editable Word, PDF and Markdown.
Create this document free. Guided forms, manual editing and downloads need no purchase. AI drafting uses your account allowance.
Sign in only when you want AI drafting or private saving.
Get the five-document pack →A draft record of the information you supply. Review before use; it does not certify qualifications, perform checks or establish compliance.
Template preview · your information replaces the placeholders
[Add your information]
[Add your information]
[Add your information]
Updated 16 October 2026
A method statement explains how a job will be done safely, step by step. This generator has a field for each of these:
For what a full set of RAMS should contain and what to check when you review them, see the RAMS checklist.
This example is fictional: guttering replacement from a mobile access tower at Unit 4, Example Trading Estate. The emergency arrangements were left blank, so the first draft showed a placeholder until the reviewer added them.
| Field | First draft | After review |
|---|---|---|
| Scope and exclusions | Replace 12 m of front guttering. Excludes downpipes and fascia boards. | No change |
| Work sequence supplied | 1. Cone off footpath. 2. Erect tower. 3. Remove old gutter. 4. Fit new gutter. 5. Dismantle tower. | No change |
| Controls supplied | Guardrails and toe boards on the tower; materials lowered by hand line, not dropped | No change |
| Emergency arrangements supplied | [Add emergency arrangements supplied] | First aider on site; nearest A&E address recorded; site manager's phone number on the tower |
If you need the risk assessment as well, the RAMS generator pack builds a risk assessment, a method statement and three related documents from one set of details. RAMS software for contractors tracks sites, assessments, review dates and reminders. RAMS Pro costs £49 a month or £490 a year (two months free when paid annually), with a 14-day free trial. RAMS Team is coming soon. The documents stay free.
If you are choosing between paid tools, compare method statement software on how each one writes method statements and what it costs, or see the wider list of RAMS software options.
Yes. The guided form, manual editing and downloads need no purchase. AI drafting is optional and uses your account allowance.
No. You enter the sequence, the controls and the emergency arrangements. The generator lays them out under method statement headings and leaves a placeholder for anything you skip.
A method statement usually sits alongside a risk assessment, which is why the form has a field to reference it. The RAMS pack builds both, plus three related documents, from one set of details.
You are. The document is a draft of the information you supply, for competent review. It does not assess whether the controls are adequate or establish that the work is safe.
An editable Word document, a PDF or Markdown.